RB iconIP iconMPE iconRBAS iconRouse icon
FavoriteΑγαπημένο
shareΜοίρασέ το
Save searchΑποθήκευση αναζήτησης
Εκτύπωση

ΠΛΗΡΟΦΟΡΊΕΣ

Κατηγορία
Εξαρτήματα μηχανών ασφάλτου
Μάρκα
Tillverkad av ägare
propertynames.pp_location_h
Jämtland
Χώρα
Σουηδία
Mascus ID
81DBB4A8

ΤΙΜΟΛΌΓΗΣΗ

Επιλογή νομίσματος:

ΛΕΠΤΟΜΈΡΕΙΕΣ

Εσωτερικό απόθεμα Νο.
S6699
Άλλες πληροφορίες
Please provide reference number upon request: S6699 Complete mobile asphalt plant, 70 tons per hour!  It is not only a complete asphalt plant that is sold, but also a unique patented one construction. Full documentation and drawings are available. The idea behind the construction is a slightly moved asphalt plant = Mobile Asphalt System. Simple and quick to establish. Move the asphalt plant instead of the place to transport asphalt masses Long size shoes.   In the asphalt plant, it is possible to manufacture all types of asphalt compounds: Cold, semi-warm, hot and recycling. The asphalt plant itself = infeed belt, drying drum and mixer, is built to a standard container frame, 40 foot high, for easy shipping. Conveyor belt and drying drum are hydraulically driven. The dryer's oil burner is electrically driven. The mixer is bolted. Bogie wheel steel ll and kingpin are bolted to the container frame for easy removal and reassembly the asphalt plant must be shipped on a container ship. The mixer part is also bolted so that it can be easily removed if necessary. The power package is mounted on a truck trailer together with 9 m3 br nsle- and 35 m3 insulated bitumen tank. The tanks are equipped with splash guards, which makes the slpet transportable regardless of the volume in the tanks. Bitumen tank has heating pipes and burners for heating. The drying drum is shortened, whereby the mixer does not stick out as much as it does that the asphalt plant can also be pulled by a tow truck. Cold dosing is moved with a load shifter, which also pulls the fuel tank. A wheel loader must be in place at the establishment site. When the trucks arrive at the establishment site, the load changer places the tank slip in place, time 15 min. Then the tow truck sets the asphalt plant itself in place at a 90 degree angle and 3 meters from the tank trailer.  Hydraulic support legs free the asphalt plant from a tractor and are then used for lowering the right slope obtained, time 50 min. The infeed belt, for the drying drum, is lowered with the help of the wheel loader and mounted on place, time 25 min. The loader places the cold dosage in place as the wheel loader pushes it in sideways in place so the input belt ends up straight, time 60 min. The wheel loader and machinist install the pipe between the suction fan and energy recovery, time 40 min. The wheel loader fills up ramps in front of loading cold dosing at the same time as machinist connects electrical cables, hydraulic and fuel hoses between drive pack and the asphalt plant, time 35 min. The wheel loader and machinist fill up the cold dosage pages for each volume, time 15 min. Total time 4 hours and the asphalt plant is ready for production. Capacity when manufacturing hot asphalt mass: 70 tons/h. Capacity when manufacturing cold asphalt mass: 110 tons/h. Production of hot asphalt mass with 70% recycling. Laying asphalt mass with 70% recycling. The asphalt plant is intended with recycling. Excess energy from the drying drum is used to heat incoming ballast.   Δείτε περισσότερα

ATS Sweden AB

Stuguvägen 2 844 51 Stugun Jämtlands län Σουηδία
4
Έτη στη Mascus
Ακολούθησε αυτόν τον έμπορο
report adΑναφορά ύποπτης αγγελίας