RB iconIP iconMPE iconRBAS iconRouse icon
FavoriteΑγαπημένο
shareΜοίρασέ το
Save searchΑποθήκευση αναζήτησης
Εκτύπωση

ΠΛΗΡΟΦΟΡΊΕΣ

Κατηγορία
Εξοπλισμός οριζόντιων διατρήσεων
Μάρκα
PERFORATOR RBZ 60 Rohrberst- und Zuganlage
Έτος κατασκευής
2023
Κατάσταση
Καινούργιο/Αχρησιμοποίητο
propertynames.pp_location_h
Walkenried, Niedersachsen
Χώρα
Γερμανία
Γενική κατηγορία
1
2
3
4
5
Mascus ID
2D642D8F

ΤΙΜΟΛΌΓΗΣΗ

Επιλογή νομίσματος:

ΛΕΠΤΟΜΈΡΕΙΕΣ

Πληροφορίες κατάστασης / Εγγύηση
Neuzustand, Gewährleistung 12 Monate
Βάρος μεταφοράς
500 kg
Διαστάσεις μεταφοράς (ΜxΠxΥ)
700 x 600 x 300 mm
Όροι αποστολής
FCA, CPT
Άλλες πληροφορίες
pulling unit - 4 hydraulic cylinders - stroke 210 mm - tractive force 600 kN - operating pressure max. 300 bar clamping unit ø60 mm - hydraulic cylinder - stroke 15 mm - operating pressure 310 bar - maximum pressing force 1,260 kN - operating pressure max. 300 bar - holding jaws ø60 mm holding unit ø60 mm - hydraulic cylinder - stroke 25 mm - max. clamping force 128 kN With the PERFORATOR RBZ-series bursting systems, pipes can be renewed and renovated in an environmentally friendly manner and without trenching in old routes. Depending on the requirements and the damage to the old pipeline, various methods can be used. The static pipe bursting method is used for the renewal of pipelines in old routes. Regardless of whether it is a gravity or pressure pipeline, the old pipeline is cut into segments by breaking or cutting, and displaced radially into the surrounding soil. At the same time, a new pipe of the same or larger dimension is pulled in. The bursting method is suitable for almost all old and new pipe materials. The pressing/drawing process involves the complete replacement of existing pipelines in a single operation. The old pipe is completely removed from the ground. The new pipe can be drawn in with the same or larger dimensions. The auxiliary pipe method is also a route-equivalent, complete replacement of existing pipelines in two work steps. It is particularly suitable for old pipes made of cast iron, ductile cast iron, steel and fibre cement. In the relining process with annular gap, pipe strings or individual pipes are inserted into the existing pipelines. The pipe dimension is reduced and the annular gap is filled depending on the process variant. In relining processes without an annular gap, a PE pipe string with a reduced cross-section is inserted into the old pipeline. In the reduction process, the new pipe later lies close to the old pipe wall (close-fit). Both process variants are suitable for both gravity and pressure pipes. The RBZ series comprises two machine sizes. This means that pipelines up to a pipe diameter of 1.000 mm can be laid trenchlessly.Δείτε περισσότερα

PERFORATOR GmbH

Bei dem Gerichte 37445 Walkenried Niedersachsen Γερμανία
Λάβετε ειδοποίηση μέσω email
report adΑναφορά ύποπτης αγγελίας